Turf Machinery Performance
Post Date : 2013 - 04 - 23

Mole Plough



Report on Macau Stadium 8-12-2005
Post Date : 2005 - 12 - 08

 

A site visit was conducted by two consultants on 10 September 2005 and soil samples were collected from different spots of the football pitch for laboratory test accordingly.



Report on Macau Stadium 17-10-2006
Post Date : 2006 - 10 - 17

The following is the survey report made for Macau Stadium which was carried out from 20th to 22nd
September 2006. The variety of vegetation is Bermuda Tifway 419 with pitch size 105 x 68 meters

 

The aim of this report is to continuously maintain and improve an excel quality standard of the facilities,
particularly the turf performance.

 

Each performance standard has a stated method of test. The following tests’result provides data which are useful for turf management and to make comparison with other pitches.

 

Readers are expected to gain maximum benefit by adopting the modified protocol and testing tools, base on The Institute of Groundsmanship from the United Kingdom for the Performance Quality Standard, with the parameters mentioned in this survey.



Track & Field Refurbishment Project
Post Date : 2004 - 03 - 31